Harbor Drive Pipelines City of San Diego.

Replacing 4.4 miles of 1940s and 1950s cast iron water mains with new 16-inch PVC mains.

Project
Harbor Drive Pipelines Replacement
Client
City of San Diego
Project type
Pipeline Replacement / Pressure Reducing Station
4.4 miCast iron pipeline replaced
2 × 16"New PVC water mains
1940s–50sAge of the mains replaced
Open trenchIn public streets and roadways
The work

The Harbor Drive Pipelines are in the Midway/North Bay and Peninsula Communities Planning Areas of City Council District 2. They serve the western part of University Heights and the northern section of the east Point Loma pressure zones, and provide backup service to one another.

The project replaces two sixteen-inch water mains installed in the 1940s and 1950s with new sixteen-inch PVC water mains — 4.4 miles of cast iron pipeline that had reached the end of its useful life — using open trench construction in public streets and roadways.

To avoid service interruptions and minimize traffic impacts, the work is coordinated with Cabrillo Elementary School, Dana Middle School, Point Loma High School, High Tech High School, San Diego International Airport, the U.S. Coast Guard and the San Diego Port District. The project improves water service, meets EPA requirements to protect water quality, and reduces the likelihood of future water main breaks and future maintenance needs.

Large-diameter pipe and fittings ready for installation

Photo from the company’s case-study page.

  • License #718202 · Class A General Engineering
  • C36 plumbing license
  • Family owned since 1994
  • 200+ public & private projects
How a job runs

From bid to restoration.

Teamwork, effective communication and hard work, so jobs are completed accurately, on time and within budget.

Request a bid
  1. 01

    Bid & estimate

    Send the plans and bid documents. Our estimating team prices the underground scope.

  2. 02

    Plan & permit

    Potholing of existing utilities, permits, traffic control and storm water pollution prevention plans.

  3. 03

    Build

    Trenching, shoring, dewatering, pipe, bedding and backfill, with bypass systems to keep service running.

  4. 04

    Restore & close out

    Connections to the existing system, trench resurfacing and site restoration, on time and within budget.

Get in touch

Planning a similar pipeline project?

Sewer, water, storm drain and CIPP lining, in public and private works. Office hours Monday–Friday, 6am to 4pm.

Work with Burtech Pipeline

Have an underground project?

Call the office in Vista, Monday to Friday from 6am to 4pm, or send us a message. Wherever and whenever you need us, we are available to complete the job.