Concept redesign preview for Burtech Pipeline — not the company’s official website.
General Engineering Contractor · Lic. #718202 Class A · Mon–Fri 6am–4pm info@burtechpipeline.com Call (760) 634-2822
Organization

Project case studies.

Scope, quantities and methods from three of our jobs.

  • License #718202 · Class A General Engineering
  • C36 plumbing license
  • Family owned since 1994
  • 200+ public & private projects
City of San Diego · Sewer / Water / CIPP / Jack & Bore / HDD & Bypass

Harbor Drive Trunk Sewer

About 4,231 lineal feet of 48-inch PLRCP trunk sewer along Harbor Drive, from Beardsley Street to 28th Street.

4,231 LF48" PLRCP trunk sewer main
427 LF48" PLRCP in a 66" steel casing by jack & bore
232 LFDual 30" HDPE siphon by HDD
13.96 MGDRaw sewer bypassed without any spills
Leucadia Wastewater District · Sewer Force Main

Batiquitos Force Main

About 8,530 linear feet each of 14-inch secondary effluent force main and 24-inch sewer force main, in a joint trench.

8,530 LF14" secondary effluent force main
8,530 LF24" sewer force main, same trench
383 LFCIPP in an existing 21" gravity sewer
2 ftThick concrete roadway cut and replaced
City of San Diego · Pipeline Replacement / Pressure Reducing Station

Harbor Drive Pipelines

Replacing 4.4 miles of 1940s and 1950s cast iron water mains with new 16-inch PVC mains.

4.4 miCast iron pipeline replaced
2 × 16"New PVC water mains
1940s–50sAge of the mains replaced
Open trenchIn public streets and roadways
How a job runs

From bid to restoration.

Teamwork, effective communication and hard work, so jobs are completed accurately, on time and within budget.

Request a bid
  1. 01

    Bid & estimate

    Send the plans and bid documents. Our estimating team prices the underground scope.

  2. 02

    Plan & permit

    Potholing of existing utilities, permits, traffic control and storm water pollution prevention plans.

  3. 03

    Build

    Trenching, shoring, dewatering, pipe, bedding and backfill, with bypass systems to keep service running.

  4. 04

    Restore & close out

    Connections to the existing system, trench resurfacing and site restoration, on time and within budget.

Get in touch

Have an underground project to bid?

Sewer, water, storm drain and CIPP lining, in public and private works. Office hours Monday–Friday, 6am to 4pm.

Work with Burtech Pipeline

Have an underground project?

Call the office in Vista, Monday to Friday from 6am to 4pm, or send us a message. Wherever and whenever you need us, we are available to complete the job.