Batiquitos Force Main Leucadia Wastewater District.
About 8,530 linear feet each of 14-inch secondary effluent force main and 24-inch sewer force main, in a joint trench.
- Project
- Batiquitos (B1/B2) Force Main Replacement
- Client
- Leucadia Wastewater District
- Project type
- Sewer Force Main
Burtech Pipeline furnished all labor, materials, equipment, tools, transportation and services for the Batiquitos Force Main Replacement Project: approximately 8,530 linear feet of 14-inch secondary effluent force main and approximately 8,530 linear feet of 24-inch sewer force main in a joint trench, replacing the existing mains.
The project also included about 383 linear feet of cured-in-place pipe in an existing 21-inch gravity sewer main (with an additional trucked bypass to line it), a 5-foot discharge manhole, isolation valves, and four air vacuum air release valves and four blow-off valves in new 4-foot manholes.
Our scope covered saw cutting and removal of concrete roadway up to two feet thick, potholing, trenching, shoring, dewatering, bedding, compaction and backfill; the Storm Water Pollution Prevention Plan and the Mitigation, Monitoring and Reporting Plan; abandonment or removal of the existing mains; corrosion protection; permits; traffic control; and trench resurfacing and site restoration back to original conditions.
- License #718202 · Class A General Engineering
- C36 plumbing license
- Family owned since 1994
- 200+ public & private projects
From bid to restoration.
Teamwork, effective communication and hard work, so jobs are completed accurately, on time and within budget.
- 01
Bid & estimate
Send the plans and bid documents. Our estimating team prices the underground scope.
- 02
Plan & permit
Potholing of existing utilities, permits, traffic control and storm water pollution prevention plans.
- 03
Build
Trenching, shoring, dewatering, pipe, bedding and backfill, with bypass systems to keep service running.
- 04
Restore & close out
Connections to the existing system, trench resurfacing and site restoration, on time and within budget.
Planning a similar pipeline project?
Sewer, water, storm drain and CIPP lining, in public and private works. Office hours Monday–Friday, 6am to 4pm.
Have an underground project?
Call the office in Vista, Monday to Friday from 6am to 4pm, or send us a message. Wherever and whenever you need us, we are available to complete the job.